Showing posts with label installation. Show all posts
Showing posts with label installation. Show all posts

Wednesday, October 25, 2023

Work

Art installation in Long Beach today. Got there at 9:30am and got home at 9:30pm! Also came up with this tile design for the lobby bathroom floor with the extra tile we had from the three other bathrooms. I was pretty proud of myself for coming up with this design with our tile installer.